name: "do-plan" description: "Create comprehensive, confidence-rated implementation plans. Always use while planning. Always use when the user mentions do:plan" hooks: PreToolUse: - matcher: "" hooks: - type: command command: "cat > /tmp/do-plan-pretooluse-$$.log" PostToolUse: - matcher: "" hooks: - type: command command: "cat > /tmp/do-plan-posttooluse-$$.log" Stop: - matcher: "*" hooks: - type: command command: "cat > /tmp/do-plan-stop-$$.log"
Plan Skill
Creates comprehensive, confidence-rated plans. Plans ALL work to some level of certainty.
Core Concepts
Sprint: A coherent unit of related work (features, fixes, implementations). NOT time-based.
Confidence Level:
- HIGH: We know the work and how to do it. Ready for implementation.
- MEDIUM: General approach clear, but details need research. Primary goal: raise to HIGH.
- LOW: Significant unknowns. Primary goal: research and clarify before implementation.
Principle: Plan ALL work to some confidence level. Better to have 4 low-confidence sprints than 1 high-confidence sprint that ignores remaining work.
Execute Command (Entry Point)
Input:
topic: Area of focus (from $ARGUMENTS)
If topic is empty, search recent conversational context for the topic, or pick the next item from the 'bd ready' queue.
Flow:
def execute_command(topic: str | None) -> str:
"""Entry point for /do:plan command"""
# Step 1: Determine topic
if not topic:
# Evaluate project holistically using PROJECT_SPEC.md
topic = evaluate_project_holistically()
# Step 2: Resolve topic directory
topic_dir = resolve_topic_directory(topic)
# Step 3: Run evaluation
evaluation = run_evaluation(topic, topic_dir)
# Step 4: Handle evaluation results
if evaluation.verdict == "BLOCKED":
return surface_blockers_to_user(evaluation)
elif evaluation.verdict == "PAUSE":
resolve_ambiguities(evaluation)
# Step 5: Generate sprint plans
sprints = generate_sprint_plans(topic, topic_dir, evaluation)
# Step 6: Validate plans
validate_plans(sprints)
# Step 7: Get user approval
approval = present_for_approval(sprints)
# Step 8: Complete
return finalize_planning(topic, topic_dir, sprints, approval)
Step 1: Determine Topic
<task-focus> $ARGUMENTS </task-focus>If task-focus is empty, infer the topic from recent conversation context. If no context is available, ask the user what they want to plan.
Output: A topic string.
Step 2: Resolve Topic Directory
All planning files for a topic live in .agent_planning/<topic-slug>/.
Process:
-
Generate a slug from the topic (lowercase, hyphenated, short)
- "user authentication" →
authoruser-auth - "payment processing" →
payments
- "user authentication" →
-
List existing topic directories:
ls -d .agent_planning/*/ -
Check for matches:
Exact match exists → Use it, proceed to Step 3
Similar directories found → Ask user:
┌─ Topic: "user authentication" ─────────────────────┐ │ │ │ Similar existing topics found: │ │ 1. auth/ (3 files, last modified: 2024-12-12) │ │ 2. login/ (1 file, last modified: 2024-12-10) │ │ 3. Create new: user-auth/ │ │ │ └────────────────────────────────────────────────────┘No similar directories → Create new directory:
mkdir -p .agent_planning/<topic-slug>
Output: Topic directory path (e.g., .agent_planning/auth/)
Step 3: Evaluation
Every plan requires fresh evaluation context.
Step 3a: Run Evaluation
Use the project-evaluator agent:
Topic: $TOPIC
Topic Directory: .agent_planning/<topic>/
<important>
You MUST write this file to: `.agent_planning/<topic>/EVALUATION-<timestamp>.md` before continuing.
</important>
Step 3b: Handle Evaluation Results
| Result | Action |
|---|---|
| CONTINUE | Proceed to Step 4 |
| PAUSE | Attempt resolution (Step 3c), then proceed |
| BLOCKED | Surface to user, ask how to proceed |
| No verdict | Treat as CONTINUE |
Step 3c: Ambiguity Resolution (if PAUSE)
For each ambiguity, ask user with prepared options:
┌─ Clarification Needed ────────────────────────────────┐
│ │
│ Question: [specific question] │
│ │
│ Options: │
│ │
│ | Option | Approach | Pros | Cons | │
│ |--------|----------|------|------| │
│ | A (Standard) | [well-trodden path] | ... | ... | │
│ | B (Creative) | [optimal improvement] | ... | ... | │
│ | C | [alternative if applicable] | ... | ... | │
│ │
│ Recommendation: [your suggestion and why] │
│ │
└───────────────────────────────────────────────────────┘
ALWAYS include:
- A "standard/well-trodden" option
- An "optimal/creative improvement" option
- Optionally a third alternative
Step 4: Generate Sprint Plans
CRITICAL: Plan ALL identified work. Do not artificially limit to 1 sprint.
You MUST write plan files
Step 4a: Assess Work and Assign Confidence
Review evaluation and categorize ALL work items by confidence:
| Confidence | Criteria | Sprint Focus |
|---|---|---|
| HIGH | Known approach, clear implementation path | Implementation |
| MEDIUM | General direction clear, details uncertain | Research → Implementation |
| LOW | Significant unknowns, multiple approaches possible | Research → Raise confidence |
Step 4b: Group into Sprints
Each sprint:
- Represents a coherent unit of related work
- Has its OWN planning documents (not shared)
- Each work item gets its own confidence tag (HIGH/MEDIUM/LOW)
- Sprint status is derived from the mix:
READY FOR IMPLEMENTATION— all items HIGHPARTIALLY READY— mix of HIGH and MEDIUM/LOWRESEARCH REQUIRED— majority MEDIUM/LOW
Sprint naming: SPRINT-<timestamp>-<slug>-<type>.md
- Slug is 2-3 words describing the work
- Type is PLAN, DOD, or CONTEXT
- Example:
SPRINT-2024-12-15-120000-auth-core-PLAN.md
Step 4c: Generate Plans
For each sprint, use the status-planner agent:
Topic: $TOPIC
Topic Directory: .agent_planning/<topic>/
Generate sprint plans with per-item confidence tags and derived sprint status.
Files per sprint:
1. SPRINT-<timestamp>-<slug>-PLAN.md - Sprint plan
2. SPRINT-<timestamp>-<slug>-DOD.md - Definition of Done
3. SPRINT-<timestamp>-<slug>-CONTEXT.md - Implementation context
All files go in the topic directory.
CRITICAL! Do NOT skip this. You MUST write plans the specified files.
Sprint Plan Templates
Sprint Plan Template:
# Sprint: [Slug] - [Name]
Generated: <timestamp>
Confidence: HIGH: N, MEDIUM: N, LOW: N
Status: READY FOR IMPLEMENTATION | PARTIALLY READY | RESEARCH REQUIRED
## Sprint Goal
[One sentence describing deliverables]
## Scope
**Deliverables:**
- [Deliverable 1]
- [Deliverable 2]
- [Deliverable 3, if applicable]
## Work Items
### P0: [First deliverable]
**Acceptance Criteria:**
- [ ] [Criterion 1]
- [ ] [Criterion 2]
- [ ] [Criterion 3]
**Technical Notes:**
- [Implementation guidance]
## Dependencies
- [Prerequisites]
## Risks
- [Known risks with mitigations]
For MEDIUM/LOW confidence items within a sprint, include per-item:
#### Unknowns to Resolve— what needs research#### Exit Criteria— what raises confidence to HIGH
Step 4d: Check for Existing Plans
CRITICAL: ALWAYS update existing plans rather than creating duplicates.
Before creating any sprint plan:
- List existing
SPRINT-*-PLAN.mdfiles in topic directory - Check if any cover the same work
- If yes: UPDATE the existing plan, don't create new
- If no: Create new plan
Step 5: Handle MEDIUM/LOW Confidence Items
For sprints with MEDIUM/LOW items, surface unknowns to user before implementation.
For each MEDIUM/LOW item, present its unknowns and research options to the user. After user input, update the item's confidence to HIGH in the sprint plan.
Step 6: Validate Plans
For each sprint plan, verify:
| Check | Pass | Fail |
|---|---|---|
| Every deliverable has acceptance criteria? | ✓ | INVALID |
| Acceptance criteria testable (2-5 per item)? | ✓ | Too vague |
| Confidence level appropriate for content? | ✓ | Reassess |
| Dependencies identified? | ✓ | Missing |
| LOW/MEDIUM have exit criteria? | ✓ | INVALID |
Plans without acceptance criteria are INVALID.
Step 7: User Approval
Present ALL sprints for approval:
┌─ Sprint Plan Summary: $TOPIC ─────────────────────────┐
│ │
│ Total Sprints: N │
│ │
│ ┌─ Sprint 1: [slug] ─────────────────────────────┐ │
│ │ Status: READY FOR IMPLEMENTATION │ │
│ │ Confidence: HIGH: 3, MEDIUM: 0, LOW: 0 │ │
│ │ Deliverables: │ │
│ │ - [Deliverable 1] │ │
│ │ - [Deliverable 2] │ │
│ └─────────────────────────────────────────────────┘ │
│ │
│ ┌─ Sprint 2: [slug] ─────────────────────────────┐ │
│ │ Status: PARTIALLY READY │ │
│ │ Confidence: HIGH: 2, MEDIUM: 1, LOW: 0 │ │
│ │ Deliverables: │ │
│ │ - [Deliverable 1] │ │
│ │ - [Deliverable 2 - needs research] │ │
│ └─────────────────────────────────────────────────┘ │
│ │
│ Options: │
│ 1. Approve all │
│ 2. Approve HIGH confidence only, discuss others │
│ 3. Revise specific sprint │
│ 4. Reject and restart │
└───────────────────────────────────────────────────────┘
Step 8: Completion
Once user approves:
-
Record approval in
.agent_planning/<topic>/USER-RESPONSE-<timestamp>.md- Include: APPROVED/PARTIAL/REJECT
- List which sprint files were approved
- Note any adjustments made
-
Confirm files saved:
.agent_planning/<topic>/ ├── EVALUATION-<timestamp>.md ├── SPRINT-<ts>-<slug>-PLAN.md # Per sprint ├── SPRINT-<ts>-<slug>-DOD.md # Definition of Done (per sprint) ├── SPRINT-<ts>-<slug>-CONTEXT.md # Implementation context (per sprint) └── USER-RESPONSE-<timestamp>.md -
Display summary:
═══════════════════════════════════════════════════════
Plan Complete: $TOPIC
Sprints planned: N
├─ HIGH confidence: X (ready for implementation)
├─ MEDIUM confidence: Y (research first)
└─ LOW confidence: Z (exploration needed)
Files:
.agent_planning/<topic>/
├── SPRINT-<ts>-<slug1>-PLAN.md [HIGH]
├── SPRINT-<ts>-<slug2>-PLAN.md [MEDIUM]
└── ...
Next steps:
HIGH confidence: /do:it $TOPIC
MEDIUM/LOW: Run research, then re-plan
═══════════════════════════════════════════════════════
Key Principles
- Plan ALL work - Don't artificially limit scope. Plan everything to some confidence level.
- Confidence drives approach - HIGH = implement. MEDIUM/LOW = research first.
- Coherent sprints - Group related work together. Sprint status derives from item confidence mix.
- Separate documents per sprint - Never reuse or combine sprint plans.
- Update over create - Always update existing plans for unworked topics.
- Options with tradeoffs - When asking users, provide standard + creative options with comparison.
- Acceptance criteria mandatory - Plans without them are INVALID.
- User approval required - All plans need explicit approval before implementation.